Mechi Highway disrupted due to landslides

The Phungling-Kabeli section of the Mechi Highway has been blocked due to landslides triggered by incessant rain occurred last night.

सम्बन्धित सामग्री

Mechi Highway disrupted due to landslides

The Phungling-Kabeli section of the Mechi Highway has been blocked due to landslides triggered by incessant rain occurred last night.

Vehicular movement resumes after 1 month along Mechi Highway

Mechi Highway, which was obstructed for a month after the flooding in Hewakhola River, has come into operation by fixing a belly-bridge.

Vehicular movement resumes after 1 month along Mechi Highway

Mechi Highway, which was obstructed for a month after the flooding in Hewakhola River, has come into operation by fixing a belly-bridge.

Mechi Highway obstructed again

PAANCHTHAR, June 28: Vehicular movement has been completely obstructed again at Hewakhola of Panchthar along Mechi highway. The vehicular movement has been obstructed again after the flood on the Hewa stream that occurred on Tuesday night damaged the diversion.

Mechi highway opens after 4 months

The Mechi Highway, which has been blocked by landslides for the past four months, has been reopened.

Mechi highway opens after 4 months

The Mechi Highway, which has been blocked by landslides for the past four months, has been reopened.

Landslide blocks Mechi Highway - Khabarhub

ILAM: The vehicular movement has been disrupted after landslides occurred at various places along the Mechi Highway.

Mechi highway obstructed in Ilam

An alternative road will be used after the road on the Mechi Highway near Dhobidhara in Ilam Municipality was obstructed by landslides.