Government Resumes Bridge Repair and Reconstruction After Flood Damage

Dhading. The government has started the work of repairing and reconstructing bridges to reconnect the local people on both sides of the Trishuli River, which were severely damaged by the heavy flood in the Bhote Koshi River in Rasuwa on Bhadra 10th.The flood damaged suspension bridges in various places in Nuwakot and Dhading, disrupting the daily commute of locals. With the damage to the bridges, locals are facing difficulties in crossing from one bank of the river to the other, and their movement to markets, schools, health institutions, and other essential services has also been affected.Bridge repair work has already...