KATHMANDU: Power production in Upper Trishuli Three 3A Hyrdropower Station and some small hydropower projects in Kakani, Nuwakot, has been halted after a person climbed on a power transmission line and has been clinging onto it. Nepal Electricity Authority (NEA) has shut down its power projects and cut off power supply to the transmission line […]