Kathmandu. The Road Department has started the process of immediately installing bailey bridges in the affected areas by intensifying the reconstruction of roads and bridges damaged by the Bhote Koshi flood. Director General of the Road Department, Dr. Vijay Jesi, informed about the status of damaged structures in the Galchi-Benighat and Bidur sections and the efforts being made during a meeting of the Infrastructure Development Committee held at Singha Durbar on Monday. Director General Jesi said that traffic has been brought back into operation by removing accumulated debris and landslides of two to four meters in the Galchi-Benighat section. Temporary...