NEA says power cut to industrial zone to continue until Upper Tamakoshi re-operated

Nepal Electricity Authority (NEA) has said the industrial customers would have to bear with power cuts in the evening time until the re-operation of the Upper Tamakoshi Hydropower Project which was damaged by flooding and landslide on September 27 and 28.

सम्बन्धित सामग्री

NEA says power cut to industrial zone

NEA says power cut to industrial zone to continue until Upper Tamakoshi re-operated