Unveiling the government policy and programmes for the upcoming fiscal year of 2081/082 BS at the joint meeting of the federal parliament today, President Ramchandra Paudel said that the air route policies will be made easy, cheap and accessible, the flying experience both international and international will be made safe, the special package will be made to brought Pokhara and Gautam Buddha International Airport into operation.
KATHMANDU: Himalaya Airlines tested a flight at the newly built Gautam Buddha International Airport in Bhairahawa on Thursday. The Nepali airline operator has tested flights as part of a training session for its pilots from Thursday between 12 pm and 5 pm, said Director General for the Civil Aviation Authority of Nepal engineer Pradip Adhikari. […]
फ्लाइ दुबई र सलाम एअरले पनि उडानका लागि चासो व्यक्त गरेको भए पनि प्रारम्भिक छलफल धेरै अघि बढ्न सकेको छैन ।नेपाल वायुसेवा निगमले समेत भैरहवाबाट उडान थाल्ने विषयमा ठोस पहल सुरु गरेको छैन ।
Mechanical test flight (calibration flight) started at Gautam Buddha International Airport on February 18 has ended.
The mechanical test flight was carried out by a special aircraft of Aero Thai brought from Thailand.
Flight calibration is done to check the navigation system and ensure radar systems are working to ensure an aircraft passes an inspection and its equipment is up to date.
In that process, tests have been done on the distance of the aircraft, the route used by the aircraft, the lights installed at the runway during take-off and landing.
General Manager of Gautam Buddha International Airport Govinda Prasad Dahal said that a technical team comprising a Thai pilot flew a mechanical flight for nine days and inspected the communications equipment.
KATHMANDU, Jan 30: If there is any technical problem in the plane flying in the Nepali sky, the situation of having to come to Kathmandu for emergency landing is coming to an end. At present, there is no alternative to returning to the Tribhuvan International Airport (TIA) for emergency landing.
The Gautam Buddha International Airport (GBIA) is ready for calibration flight, which is an experimental flight operation to test runway, tower and other equipment used at the airport.
Chief of GBIA Construction Project, ICP 2, Prabin Neupane said that airplane should be brought to the newly built airport that would be second international airport in the country after the Kathmandu-based Tribhuvan International Airport.