Kavrepalanchowk, Nov 2: Vehicular movement along BP highway that had come to a standstill for the past three days due to landslide and flood has resumed from this morning. The highway was blocked due to landslide occurred at different places on Chaukidanda-Nepalthok section towards Kavrepalanchowk along the highway. The traffic along the road section has come into operation after removing landslide debris as well as constructing a road diversion, said Senior Divisional Engineer at the Division Road Office, Bhaktapur, Suman Yogesh. A 50-meter diversion was constructed at Roshi rural municipality-8 in Kavre to bring the vehicular movement into operation. Problem...