One-way traffic resumes in BP Highway

BANEPA, July 4: The BP highway has been resumed for traffic after the obstruction due to floods in Mamti river in Roshi rural municipality was cleared. One-way traffic has been resumed at the joint initiative of police, the rural municipality, road project and locals. The road section in the border of ward nos 11 and 12 of the rural municipality remained closed since 12:00 midnight on Friday and resumed at 2:30 pm on Saturday, police inspector at Area Police Office, Mangaltar Sherkhar Khadka said. A dozer was used to clear the sludge gathered on the road and hence one-way traffic was resumed. A large number of vehicles and their passengers had remained stranded as a result.  

सम्बन्धित सामग्री

Traffic resumes on BP Highway

MANTHALI (RAMECHHAP) Dec 25: Traffic on the BP Highway that was disrupted following the death of two people in a motorcycle accident has resumed. Irate locals torched a bus that hit the motorcycle and blocked traffic on the highway. Police intervened to restore the traffic movement from 1:00 PM today.

Traffic resumes on BP Highway

MANTHALI (RAMECHHAP) Dec 25: Traffic on the BP Highway that was disrupted following the death of two people in a motorcycle accident has resumed. Irate locals torched a bus that hit the motorcycle and blocked traffic on the highway. Police intervened to restore the traffic movement from 1:00 PM today.

BP Highway resumes

MANTHALI, RAMECHHAP: Traffic on the BP Highway that was disrupted following the death of two people in a motorcycle accident has resumed. Irate locals torched a bus that hit the motorcycle, disrupting the Highway. Police initiated to restore the traffic from 1:00 pm today. The bus (Bagmati Province 01-006 Kha 4593 ) belonging to the […]

Traffic on BP Highway resumes

Traffic on the BP Highway that was disrupted following the death of two people in a motorcycle accident has resumed. Irate locals torched a bus that hit the motorcycle, disrupting the Highway. Police initiated to restore the traffic from 1:00 pm today.

BP Highway sees heavy traffic in days before elections

Thousands of people are leaving for their home districts to exercise their franchise.

BP Highway sees heavy traffic in days before elections

Thousands of people are leaving for their home districts to exercise their franchise.

One-way traffic resumes in BP Highway

The BP highway has been resumed for traffic after the obstruction due to floods in Mamti river in Roshi rural municipality was cleared. One-way traffic has been resumed at the joint initiative of police, the rural municipality, road project and locals.

BP Highway obstructed due to flood

The flood-fed Mamdi rivulet flowing through Roshi rural municipality-12 caused disruption of road traffic along the BP Highway.

Coronavirus fear stretches traffic jam in Bhaktapur

It was 7:30 am and BP Highway, that links Kathmandu Valley with the Eastern Terai region at Bhaktapur was jam packed with vehicles. The exact location from Chundevi to Adharsa Jagati, which had never seen such a traffic jam in normal days, except for Dashain, was congested on Sunday.